Introducing hybrid compute on Perplexity
⌘ Mac App
Computer can now split a task between cloud
and a local model on your Mac.
What should we work on?
What should we work on?
and runs personal and confidential data on your Mac.
The revised buyout case clears the hurdle
Revenue growth was reworked, benchmarked, and the IC deck was updated.
Frontier models run in the cloud.
Now available on
Perplexity Mac App
perplexity
Mac Appcloud and a local model on your Mac.
What should we work on?
flags sensitive information
data on your Mac.
Done — model reworked, benchmarked, and the IC memo updated.
The headline
The revised July 27 case improves returns rather than breaking them: 2.29x MOIC / 18.1% gross IRR, up from 2.20x / 17.1% on the May 8 CIM case. Losing the Tier-1 chassis program to insourcing (FY27 OEM growth cut −5.5% → −14.0%) is more than offset by the two national aftermarket service contracts signed in Q2 — aftermarket goes from 30.7% of FY26E revenue to 43.5% by FY30E, and that mix carries richer margin. FY30E Adj. EBITDA lands at $113.3M vs $109.7M before.
Against the 2.00x / 17.0% mandate that's +0.29x MOIC and +110 bps of cushion — it clears.
Benchmark
Entry at 10.5x sits inside the precedent IQR (10.1x–11.5x, median 10.95x) — a 4.1% discount to the median-implied EV of $750.1M. Revenue CAGR of 7.3% is also within range. The one outlier: FY30E EBITDA margin of 23.0% clears the comp 75th percentile of 21.4%, so the plan is underwriting best-in-class profitability. That’s the assumption most exposed to challenge, and it’s why the exit is held flat at the comp median rather than expanding.
Two things to watch
- FY27 liquidity, not returns, is the binding constraint. Unlevered FCF troughs at $20.6M (from $30.0M) as the Monterrey capex is pulled forward and service-parts working capital builds. Against $31.4M of cash interest and $3.8M of amortization, the revolver is the swing factor.
- Thin insulation at the floor. At the base 11.0x exit, a 10% miss on FY30E EBITDA lands at 1.99x — right on the 2.00x floor.
The memo is a new file, not an overwrite — your November Meridian Software memo is untouched. Model on the Desktop, memo in Downloads. Section 7 conditions the approval on a $40M revolver with a springing (not maintenance) covenant, a 50% rate hedge, board-approved capex phasing with a deferral option, and the final QoE as a closing condition.
Revised management case — reworked from the July 27 IC memo.
Mac App
